1) Fornecimento de projeto e execução de alterações do quadro existente de 4000A da zona de produção de minério concentrado da mina Somincor em Neves Corvo.
2) Fornecimento de projeto e construção de quadro novo de baixa tensão, de potência 6300A/100KA.

Somincor – Minas Neves Corvo

M.T. Cable Installation Project in suspension mode for CPV16 and CPE02, the Neves Corvo – Somincor SA mines.

Installation of 15KV cables, in suspension mode, from the CPV16 ventilation hole on section 1, in the Neves Corvo mines of Somincor SA.

Installation of 15KV cables, in suspension mode, from the CPV16 ventilation hole in sections 2 and 3, in the Neves Corvo mines of Somincor SA.

Installation of 24KV electrical cables, plus a 240mm2 earth conductor and double fiber optic cable, in single fixed-point suspension mode in one of the main ducts, about 390 meters deep, at the Neves Corvo copper and zinc mine .

  1. Provision of design and execution of changes to the existing 4000A framework for the concentrated ore production zone of the Somincor mine in Neves Corvo.
  2. Supply of design and construction of a new low voltage switchgear, power 6300A / 100KA.

We offer the best solutions!